Difference between revisions of "Prerequisites"
From Notes_Wiki
(Created page with "Before starting switch configuration, ensure: • Power and physical network connectivity are verified. • Switch is running the approved firmware version. • Access to the switch console or management IP is available. • Network design document and IP plan are reviewed.") |
(No difference)
|
Latest revision as of 06:03, 4 December 2025
Before starting switch configuration, ensure:
• Power and physical network connectivity are verified. • Switch is running the approved firmware version. • Access to the switch console or management IP is available. • Network design document and IP plan are reviewed.