Difference between revisions of "Prerequisites"

From Notes_Wiki
(Created page with "Before starting switch configuration, ensure: • Power and physical network connectivity are verified. • Switch is running the approved firmware version. • Access to the switch console or management IP is available. • Network design document and IP plan are reviewed.")
 
(No difference)

Latest revision as of 06:03, 4 December 2025

Before starting switch configuration, ensure:

   • Power and physical network connectivity are verified.
   • Switch is running the approved firmware version.
   • Access to the switch console or management IP is available.
   • Network design document and IP plan are reviewed.