Scope
From Notes_Wiki
Revision as of 06:02, 4 December 2025 by Kalyan (talk | contribs) (Created page with "This procedure applies to all managed switch deployments (Layer 2 / Layer 3) performed by the network implementation or field engineering team at customer premises. It covers post-installation configuration and verification steps for both access and distribution layer switches.")
This procedure applies to all managed switch deployments (Layer 2 / Layer 3) performed by the network implementation or field engineering team at customer premises. It covers post-installation configuration and verification steps for both access and distribution layer switches.