Prerequisites

From Notes_Wiki
Revision as of 06:03, 4 December 2025 by Kalyan (talk | contribs) (Created page with "Before starting switch configuration, ensure: • Power and physical network connectivity are verified. • Switch is running the approved firmware version. • Access to the switch console or management IP is available. • Network design document and IP plan are reviewed.")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Before starting switch configuration, ensure:

   • Power and physical network connectivity are verified.
   • Switch is running the approved firmware version.
   • Access to the switch console or management IP is available.
   • Network design document and IP plan are reviewed.