Related changes
From Notes_Wiki
Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
10 April 2024
N 04:10 | Stacking netgear switches diffhist +2,509 Saurabh talk contribs Created page with "Home > Switch configuration notes > Stacking netgear switches To stack two Netgear M4300-24X switches using cli use below steps: # Identify the ports to be used for stacking. These could be either 1 or 2 stack ports, depending upon need and availability. Ensure we have appropriate cables to connect these ports (DAC, copper, LC-LC, etc.). '''Dont connect these cables yet. We will connect during reboot in future steps'''. # Ideally stack switches..." |